A model for analysis and monitoring of energy consumption was made at the Department of Surface Mining, Faculty of Mining and Geology in Belgrade, headed by Prof. dr Radomir Simic. The model consists of four main blocks as follows: analytic block for structural design, analytic block for project design, correction for technological block and a block for existing technological process. The mentioned blocks permit that within a model zone, where analysis and preparation works are carried out, constructive and project designs are studied with the aim to estimate the installed power at machines, then working and technological parameters, as well as the adjustment of natural factors with the opening of the pit. In case the solutions within the construction and the project are correct, they are applied at the block of the existing technological process, namely the zone of the input data. The main part of the model represents the determining of standards and recording, thus allowing computer preparation and modelling in the coding and modelling zone. The final part of the model represents the zone of optimization and output data where the technological, spatial and organizational parameters are optimized and where the realized specific energy consumption and the economic effects are determined.
Elaboration of the said models was carried out by dr Miodrag Gomilanovid in the conditions of the “Potrlica” coal open pit mine in the Pljcvlja coal basin. The annual coal capacity of the “Potrlica” coal open pit mine is 1.5 million tons, and 6.1 million m3 of overburden. The pit belongs to a deep type having exceptionally complex exploitation conditions. The complexity of conditions is determined by: depth of occurrence and angle of inclination of coal scam, properties of overburden, foot wall and coal seam with partings, strong presence of ground and surface waters, pronounced geomechanical problems, problems of storing the excavated overburden, seismically effects on the town of Pljevlja and other settlements. All those conditions determined the technology which during the process of excavating, loading and transportation of coal appears as discontinues, while it is combined in the process of overburden transportation.
Excavation of overburden and interlayer tailing is carried out at several levels from 5 to 15 meters, in high and depth, by bucket dredgers and draglines, with shovel bucket volume from 4 to 15 m3. Prior to excavation, drilling-blasting works on coal are performed as well as the works on interlayer tailing in almost entire hanging wall – overburden. Only the surface part of overburden, composed of humus and alluvial (pebble, sand and clay) is not blasted. As a leading global manufacturer of crushing and milling equipment, we offer advanced, rational solutions for any size-reduction requirements, including quarry, aggregate, grinding production and complete stone crushing station. We also supply individual jaw crusher and Raymond mill as well as spare parts of them.
Transportation of overburden, within the limits of the open pit surface itself, to internal waste dump and crushing equipment is carried out by dumper capacity from 50 to 70 t, and volume of loading frame from 30 to 50 m3. Transportation of overburden to the external deposit is carried out by belts with previous crushing of material by crushers. At the present stage of exploitation, six transporters were installed, three of which being permanent and three mobile, in a total length of around 4500 m. The said transportation system also consists of below-level dump stackers and above- level dump stackers having the capacity adjusted to transporters. Coal transportation from open pit mine to crushing and separation plant is also performed by dumpers capacity of 36 t, volume frame of 26 m’. In this plant classification of coal is made depending on its market purpose.
- Author Articles
- More From This AuthorIn recent years, the high-speed rail, highway, housing and other infrastructure are developing rapidly in China, and the sand and stone industry also entered an unprecedented age. The number of the companies...The term 'primary crusher', by definition, might include any type and size of crushing machine. It implies that at least two stages of crushing are involved, but in many cases the machine which performs the...The stone directly falls into the high-speed rotary wheel from the above of the machine, under the driving force of the high-speed centrifugal force; it is impacted with high-speed and crushed with...In the current society with economy rapidly developing, we should always keep a clear head in the meantime of development. In recent years, along with the rapid development of the economy in our country, the...Ball grinder is mainly composed of charging and discharging, cyclone and rotation parts (like redactor, minor rotation gear, motor, electric machine, etc). Hollow axis is made of steel parts with a lining...
- Related Articles
- Related ArticlesWhen you are relocating, there are several issues that you have to address. You need to have your household items shipped using a reputable mover. You should also have your car shipped, rather than drive it...As the countdown starts to your pension day, your pension fund service may contact you to provide you a variety of options on what to do with your fund. Different pension annuities will be provided, with the...These days it is one of the most famous trends to cover up the beautiful wedding gown of the bride.These cotton attires are available in a variety of styles, designs, prints, patterns, colors and sizes.If...Seductive Sydney is a playground for young and old, for city slickers and nature lovers alike. On a daily basis, tourists from the furthest corners of the world make their way down South to experience the...Open source technology has introduced a significant change in the web world. Be it large-sized business enterprises or SMEs, everyone seems to implement these open source software for improving their online...
- Latest Articles
- Latest ArticlesThe updated Test4actual 70-482 Microsoft MCSD: Windows Store Apps Using HTML5 lab simulation and Test4actual 70-482 brain dumps intereactive testing engine online provides the 100 % guarantee success in...IBM IBM Cognos TM1 10.1 Developer COG-702 Exam Number/Code : COG-702 Exam Name : IBM Cognos TM1 10.1 Developer One year free update Once failed,100% refund Questions and Answers : 60Q&As Update Time :...The Microsoft 70-450 free dumps study package for Microsoft exam 70-450 covers all the requirements of 70-450 preparation and is an ultimate resource to assist your PRO: Designing, Optimizing and...Proper training for EMC Cloud Architect E20-002 begins with preparation products designed to deliver real EMC Cloud Architect E20-002 results by making you pass the test the first time. A lot goes into...The 70-432 exam seemed so difficult to pass through the above introduction. But don??t worry, you have Test4actual. It is the leader of IT certification exam material providers. The Microsoft 70-432...