How is Crusher Installed, Debugged and Operated?

User Rating: / 0
PoorBest 

The machine can be offered after assembled by our factory. The customers should check the machine after receiving it so as to make sure whether some problems appear during the transportation.

1. Because the machine vibrates heavily during operation, it must be installed on the concrete base. The weight of he base should be 8-10 times that of the machine. The depth of the groundwork should be deeper than the congeal depth of the earth. The size on the foundation diagram is the relative position of the mainframe and the ground bolts of the motor, as well as other related parameters which are not used as construction diagram. When installing the ground bolts, the holes must be prepared for the second grouting. The height and size of the material funnel is determined by the site.

2. In order to reduce vibration, when installing the equipment, it’s better to put a 10mm rubber belt between the crusher and the concrete base as a cushion material. When the concrete of the second grouting time is tight, screw the ground bolts. During this process, a gradienter should be used to measure the crusher. The warp of the level degree should be controlled below 2mm. the level degree of the frame is very important. It can make sure the position of the feed opening is not decline, so that unilateral feeding does not appear to avoid the machine being broken due to uneven loading.

3. When installing the motor, not only the distance with the mainframe should be inspected, customers also should make sure that the grinding roller is corresponding to each other, before the belt of motor and the grooved wheel of mainframe is balanced, so as to ensure that all the triangle belts work efficiently.

4. The size of the discharging open should be adjusted according to the product size and the disposal capacity. Before adjust the discharge open, unscrew the frapped spring. Then, adjust the tensibility of the spring to prevent the toggle from falling. (see details in the adjusting parts)

5. Trial operation

(1) No-loading trial operation

a. lasting for 2 consecutive hours, and the temperature rise of the bearing should be lower than 30℃

b. All the firmware is fastened well.

c. The fly wheel and grooved pulley run well

d. There are no abrasion, rubbing and abnormal noises in abrasive parts

e. The adjusting range of discharge open should be based on the requirement.

(2) loading trial operation

This can only be operated when the no-loading trial operation is successful.

a. there should not be periodical or striking noise in the crusher;

b. the max feeding size should be according to the design.

Lasting for 8 hours, and the temperature rise should not be over 30℃. The highest temperature should below 70℃. With its high quality products such as hammer crusher, Raymond mill, Hongxing Machinery has ascended in the front rank of the world in the exporting of mining equipment. Let’s look at this from a peak sports performance viewpoint. Do you think the swimmer Michael Phelps could have achieved 8 gold medals at the 2008 Olympics without any or even very little preparation? There is no way he could of just rolled out of bed, skipped stretching and warm-ups, exercising, and weight lifting to achieve such phenomenal results. His coach helped him maximize his “peak swim time” performance through maximum preparation.


Author Articles
More From This Author
In recent years, the high-speed rail, highway, housing and other infrastructure are developing rapidly in China, and the sand and stone industry also entered an unprecedented age. The number of the companies...
The term 'primary crusher', by definition, might include any type and size of crushing machine. It implies that at least two stages of crushing are involved, but in many cases the machine which performs the...
The stone directly falls into the high-speed rotary wheel from the above of the machine, under the driving force of the high-speed centrifugal force; it is impacted with high-speed and crushed with...
In the current society with economy rapidly developing, we should always keep a clear head in the meantime of development. In recent years, along with the rapid development of the economy in our country, the...
Ball grinder is mainly composed of charging and discharging, cyclone and rotation parts (like redactor, minor rotation gear, motor, electric machine, etc). Hollow axis is made of steel parts with a lining...
Related Articles
Related Articles
Proper training for EMC Cloud Architect E20-002 begins with preparation products designed to deliver real EMC Cloud Architect E20-002 results by making you pass the test the first time. A lot goes into...
Make the choice to go to driving school is one of the best things you can do for yourself and your life. There is a chance that you will be in a situation to drive at some point in their lives, most likely for...
Romain Jerome titanic DNA watches are luxury and consist of rare metal commencing the hull of the world’s mainly well-known Cruise lining. THE TITANIC! The dial as well comprises coal that was exposed at...
It is essential to recognize the importance of Social Media before we come up to a response to this query, “How do you make use of social media to benefit your website?” Social media is a broad term that...
House clearance can be a tedious task, especially when you have a lot of stuff to remove from your house, basement or the garden. House clearance services come in handy as they offer a speedy as well as...
Latest Articles
Latest Articles
The updated Test4actual 70-482 Microsoft MCSD: Windows Store Apps Using HTML5 lab simulation and Test4actual 70-482 brain dumps intereactive testing engine online provides the 100 % guarantee success in...
IBM IBM Cognos TM1 10.1 Developer COG-702 Exam Number/Code : COG-702 Exam Name : IBM Cognos TM1 10.1 Developer One year free update Once failed,100% refund Questions and Answers : 60Q&As Update Time :...
The Microsoft 70-450 free dumps study package for Microsoft exam 70-450 covers all the requirements of 70-450 preparation and is an ultimate resource to assist your PRO: Designing, Optimizing and...
Proper training for EMC Cloud Architect E20-002 begins with preparation products designed to deliver real EMC Cloud Architect E20-002 results by making you pass the test the first time. A lot goes into...
The 70-432 exam seemed so difficult to pass through the above introduction. But don??t worry, you have Test4actual. It is the leader of IT certification exam material providers. The Microsoft 70-432...
 


Search for articles

RSS

Member Login