Inspection and Servicing the Jaw Crusher
a. Make a complete visual inspection to make sure the required tools, repair parts, and pub- lications are with the equipment (TM 5-3$20- 205-10/2).
b. Visually inspect the engine, motors and mounted components for missing parts or dam- age that may have occurred during loading. Shipment, or unloading (TM 5--3820-205- 10i2).
c. Inspect the wiring, fuel and oil lines, radi- ator and hoses, fuel tank, gages, and instru- ments and lights for broken, loose, missing, or damaged parts (TM 54820-205-10/2).
d. Inspect drain plugs, breathers, fill caps, and draincucks to be sure they are secured and not leaking or damaged (TM 5-3820-20;- 10/2).
e. Inspect tires, conveyor belts, airbrake hose and electrical leads for cuts, breaks, cracks, or signs of deterioration. Correct or report any deficiencies noted and not corrected to field maintenance.
f. Perform the preventive maintenance services (par. 20).
g. When the jaw crusher is received with new dry charge batteries and electrolyte packed separately, perform the following services.
(1) Remove battery box cover and fill caps (TM 5-3920-205-10/2).
(2) Pour the electrolyte into each battery cell to a level of three-eighth inch above the plates.Hongxing Company lays much emphasis on the quality and clients. We serve clients with the quality guideline of being responsible for every working procedure, every product and every client. What we have done is for the clients and we believe that quality is the best way to develop market. All of the products have passed the authentication of ISO9001. Hongxing Brand is the Chinese Famous Brand. Reliable and stable quality is the key to success; our products are well known at home and abroad. Now we have tens of thousands of users throughout China and more than 30 world markets, such as: South Africa, Middle East, India, Philippine, Western Europe, Southeastern Asia.
The leading products of our company include: ball mill,raymond mill, sand-maker, jaw crusher, hammer crusher, vertical compound crusher, rotary kiln, drier, vibrating screen, sand washer, magnetic separator, SF flotation machine, roll crusher, belt conveyor, bucket elevator, spiral classifier, impact crusher, disk granulator, final screen, lift mixer, table Concentrator, centrifugal ore separator, high-efficiency Concentrator, disc feeder, pendulum type feeder and hydraulic cyclone. Moreover, we can provide program design, process flow design, standard and non-standard design for clients.
The persistent operating theory of Hongxing is: the development way depends on the concept and the good product comes out of the good faith. We have been awarded the “Civilized Enterprise” “Key Enterprise” “Enterprise with Standard Quality” and “Enterprise with Honesty and Credit Standing”. And Hongxing Brand is a "China Famous Brand" for reliable and stable quality. We firmly believe that we can get sincere repayment with our sincere dedication.
(3) Check the batteries in accordance with TM 9-6140-200-15 and the filler caps and battery box cover. Warning: Do not allow the electrolyte to come in contact with the body, clothing, or equipment. The electrolyte solution contains sulphuric acid which can cause serious injury to personnel and damage to clothing and equipment.Henan Hongxing Mining Machinery Co., Ltd is the professional manufacturer of complete sets of mining machinery, for example,vibrating screen,cement production line Welcome all of you to visit our official website.sand washing equipment:http://www.hx-crusher.com/sand_washer.html
h. When the jaw crusher is received with wet batteries, service (TM 5-3820-205-10/2) and test (par. 80). For additional information on servicing, testing and battery maintenance, refer to TM 9-6140-200-15.
i. When the jaw crusher is received in cold weather, till the engine cooling system with antifreeze solution to protect the system to the lowest expected temperature. Refer to table 1. and TM 9-207 as a guide.
j. On new equipment Rush the fuel lines and fuel Alters as follows:
(1) Disconnect fuel line from the filter at the fuel pump.
(2) Drain the fuel filter (TM 5-3820- 205-10/2).
(3) Flush fuel lines and filters by operating the primer pump (TM 5-3820- 20.5-10/2).
(4) Connect fuel line at fuel pump.
(5) Disconnect fuel lines from injectors.
(6) Operate starter for 30 seconds (TM 5-3820-205-10/2).
(7) Connect fuel lines to injectors.
(8) Disconnect the fuel return line, re- move the elbow and install a plug in the pipe tee.
(9) Start engine (TAT 5-3820-205--10/2).
(10) Stop the engine, remove the plug from the tee, install the elbow, and connect the return fuel line.
- Author Articles
- More From This AuthorHongxing Machinery always adheres to the management policy 'people-oriented, regulation-oriented', since its foundation. We are absorbed in every detail to insure the good quality. The company implements the...Mining equipment has really come a long way in the last few years. You need to make sure that you choose the highest quality of mining tools so that you can keep your costs down and improve productivity....According to the industry policy that our country will give significant support to the development of basic industry like energy, transportation and raw material, as the backbone of these basic industries,...Private machinery enterprise had won the market,Shaking concentrator machine, there is a ready cash to eat. But in the fierce competition in the market always maintain leading position, they must keep the...Sudan, short for The Republic of the Sudan. Sudan is located in the south-east of Africa. It's the biggest country in Africa. The industry in Sudan is backward. And the mining too. The main economy is...
- Related Articles
- Related ArticlesOf course, there are many of us who have taught myself how to drive. This can happen when we saw the parent or relative of a car left in a car drive by and we decided to experiment with or without their...B R I N G I N G OPPORTUNITY F O R INVESTMENT Investment Opportunities are available at 30 locations pan India in ownership for Individual / Institutional Investors / Real Estate developers and...Undoubtedly, real estate investment is the most advantageous, risk free and profitable investment. It is easy to make money effortlessly out of this investment provided you find the right property at right...Finding fashion items for women is no longer difficult with the advent of the internet. There are a number of online boutiques where you can find a variety of fashion items. If you are looking for cheap and...Preparing for your baby’s baby shower, room, toys or clothes can be very exciting but those aren’t the only things you should be preparing for. Having a baby can very expensive and you may need all of the...
- Latest Articles
- Latest ArticlesThe updated Test4actual 70-482 Microsoft MCSD: Windows Store Apps Using HTML5 lab simulation and Test4actual 70-482 brain dumps intereactive testing engine online provides the 100 % guarantee success in...IBM IBM Cognos TM1 10.1 Developer COG-702 Exam Number/Code : COG-702 Exam Name : IBM Cognos TM1 10.1 Developer One year free update Once failed,100% refund Questions and Answers : 60Q&As Update Time :...The Microsoft 70-450 free dumps study package for Microsoft exam 70-450 covers all the requirements of 70-450 preparation and is an ultimate resource to assist your PRO: Designing, Optimizing and...Proper training for EMC Cloud Architect E20-002 begins with preparation products designed to deliver real EMC Cloud Architect E20-002 results by making you pass the test the first time. A lot goes into...The 70-432 exam seemed so difficult to pass through the above introduction. But don??t worry, you have Test4actual. It is the leader of IT certification exam material providers. The Microsoft 70-432...





